Approvals for Atlantic Canada's first utility-scale solar farm.
We prepared preliminary designs and the Environmental Impact Assessment that won provincial approval for New Brunswick's first utility-scale solar farm.
C2 Solar Ltd. is a renewable energy start-up formed to permit, build and operate utility-scale solar farms to help New Brunswick move to a low-carbon economy. In 2018 the company engaged Fundy Engineering to prepare preliminary designs for Atlantic Canada’s first utility-scale solar farm, in the Bathurst Mining Camp region.
At 10 MW, phase one would supply clean electricity to at least 2,000 homes using 31,200 panels across 40 hectares, with a net carbon dioxide equivalent offset of about 83,000 tonnes over 25 years.
Because the facility exceeds the 3 MW threshold for electricity generation under New Brunswick’s EIA Regulation, the project required registration and review. Our team completed baseline data collection and environmental constraints mapping in 2018, assessed potential interactions with ten valued environmental components, and prepared the registration document with public, stakeholder and regulatory consultation.
The assessment found a favourable to moderate overall effect. Best-management practices were written into a project-specific environmental protection plan to mitigate the limited potential impacts identified. Registered in July 2019, the project received regulatory approval in February 2020, and the work was recognized with an Association of Consulting Engineering Companies of New Brunswick Engineering Excellence Award that year.
Related work

Ground-truthing 1,658 hectares for a 42 MW wind project

A baseline and a plan for a lake the whole town uses

Turning habitat compensation into 540 retrieved traps and a saved livelihood
Read more: Does my project need an Environmental Impact Assessment in New Brunswick? Triggers, registration, timelines and what reviewers look for · How to choose an engineering consultant in Atlantic Canada: what to ask, and why multidisciplinary and employee-owned matters · Permitting wind and solar farms in Atlantic Canada: a developer's roadmap from constraints mapping to approval
Start the conversation
A short project brief takes two minutes. A senior engineer in the right discipline reads it and gets back to you within one business day.