Burchill Wind Farm

Ground-truthing 1,658 hectares for a 42 MW wind project.

Desktop mapping, two summers of wetland and watercourse delineation, an environmental permitting roadmap and a winter geotechnical program let turbine locations be optimized and construction proceed.

Burchill Wind Farm

In March 2019 Saint John Energy signed with Natural Forces to add renewable generation to its portfolio. The ten-turbine, roughly 42 MW Burchill Wind Project, which generates clean electricity for up to 10,000 homes, triggered Environmental Impact Assessment review.

Finding what the maps missed

Desktop constraints mapping of the 1,000-plus hectare parcel showed numerous unmapped watercourses and wetlands. Our environmental team spent the summers of 2019 and 2020 ground-truthing the site, identifying and delineating those features and characterizing flora, fauna and habitat. Turbine locations were then optimized against the field data and EIA analysis to reduce overall impact, with mitigation measures developed where effects on watercourses or wetlands were unavoidable. We also prepared Saint John Energy’s environmental permitting roadmap and a turbine setback optimization analysis.

What the ground said

In the winter of 2020 our geotechnical team used boreholes and test pits along the proposed roads, turbine locations, crane pads and laydown areas. The investigation found shallow loose-to-compact topsoil and organics over very severely fractured to very sound igneous and volcanic bedrock. Recommendations, including engineered fills, allowed construction to move forward.

Related work

More environmental projects.

All environmental work
Violet Solar Farm
New Brunswick2020

Violet Solar Farm

Approvals for Atlantic Canada's first utility-scale solar farm

Read more: What a geotechnical investigation tells you (and what it costs to skip one) · Does my project need an Environmental Impact Assessment in New Brunswick? Triggers, registration, timelines and what reviewers look for · Permitting wind and solar farms in Atlantic Canada: a developer's roadmap from constraints mapping to approval

Start the conversation

Planning something like Burchill Wind Farm? Let's compare notes.

A short project brief takes two minutes. A senior engineer in the right discipline reads it and gets back to you within one business day.

Start a project Call 506.635.1566 Saint John, NB · Clyde River, PEI
Start a project